Guide for Daily Inspection
of Trenches and Excavations
|
|
Project: |
Date: |
Weather: |
Soil Type: |
| |
|
|
|
|
|
|
Trench Depth: |
Length: |
Width: |
Type of Protective
System: |
| |
|
|
|
|
|
|
| Yes |
No |
N/A |
Excavation |
|
|
|
|
Excavations and Protective Systems
inspected by Competent Person daily, before start of work. |
|
|
|
|
Competent Person has authority to
remove workers from excavation immediately. |
|
|
|
|
Surface encumbrances supported or
removed. |
|
|
|
|
Employees protected from loose
rock or soil. |
|
|
|
|
Hard hats worn by all employees. |
|
|
|
|
Spoils, materials, and equipment
set back a minimum of 2' from edge of excavation. |
|
|
|
|
Barriers provided at all remote
excavations, wells, pits, shafts, etc. |
|
|
|
|
Walkways and bridges over
excavations 6' or more in depth equipped with guardrails. |
|
|
|
|
Warning vests, or other highly
visible PPE provided and worn by all employees exposed to vehicular
traffic. |
|
|
|
|
Employees prohibited from working
or walking under suspended loads. |
|
|
|
|
Employees prohibited from working
on faces of sloped or benched excavations above other employees. |
|
|
|
|
Warning system established and
used when mobile equipment is operating near edge of excavation. |
| |
| Yes |
No |
N/A |
Utilities |
|
|
|
|
Utility companies contacted and/or
utilities located. |
|
|
|
|
Exact location of utilities marked
when near excavation. |
|
|
|
|
Underground installations
protected, supported, or removed when excavation is open. |
|
| Yes |
No |
N/A |
Wet Conditions |
|
|
|
|
Precautions taken to protect
employees from accumulation of water. |
|
|
|
|
Water removal equipment monitored
by Competent Person |
|
|
|
|
Surface water controlled or
diverted. |
|
|
|
|
Inspection made after each
rainstorm. |
|
| Yes |
No |
N/A |
Hazardous Atmosphere |
|
|
|
|
Atmosphere tested
when there is a possibility of oxygen deficiency or build-up of
hazardous gases. |
|
|
|
|
Oxygen content is
between 19.5% and 21%. |
|
|
|
|
Ventilation provided
to prevent flammable gas build-up to 20% of lower explosive limit of
the gas. |
|
|
|
|
Testing conducted to
ensure that atmosphere remains safe. |
|
|
|
|
Emergency Response
Equipment readily available where a hazardous atmosphere could or does
exist. |
|
|
|
|
Employees trained in
the use of Personal Protective and Emergency Response Equipment. |
|
|
|
|
Safety harness and
life line individually attended when employees enter deep confined
excavation. |
| |
|
Signature of Competent Person
_______________, Date _____________ |
|